Odolanów swimming pool

Construction of a modern indoor school swimming pool with a connection to the primary school, as well as technical infrastructure and land development. The building is made of masonry and reinforced concrete with ceilings made of hollow core slabs. The structure of the swimming pool hall consists of prefabricated reinforced concrete columns and wooden girders.…

Implementation of investments for JMP

Construction of a two-nave production and warehouse hall with a three-story office and social building with technical infrastructure and land development. The structure of the hall, 14.5 m high, made of prefabricated reinforced concrete columns and a steel roof structure, equipped with two overhead cranes with a load capacity of 40 t and 10 t,…