Construction of a two-nave production hall, a single-aisle warehouse hall with a two-story office and social building as well as technical infrastructure and land development. The structure of the halls, 5.7 m and 10.9 m high, made of prefabricated reinforced concrete and steel columns, steel roof structure. An office building made in brick and reinforced concrete technology with filigree ceilings. The facility is equipped with all technical installations enabling the production of foil and paper packaging for bread and herbs from the supplied raw material.

Investor details: P.P.H.U. EFEKT SP. K. JANUSZ FRĄCKOWIAK I SPÓŁKA
Place of implementation: Podzborów
Area of the extended facility: 3883 m2
Completion date: 2023