Construction of a modern indoor school swimming pool with a connection to the primary school, as well as technical infrastructure and land development. The building is made of masonry and reinforced concrete with ceilings made of hollow core slabs. The structure of the swimming pool hall consists of prefabricated reinforced concrete columns and wooden girders. Steel connector covered with a sandwich panel with numerous glazing, constructed as a bridge structure. The facility is equipped with the necessary technology to operate a swimming pool with a movable bottom, a paddling pool for children with attractions, and jacuzzi bathtubs. There will also be a SPA zone in the building, including: a dry and steam sauna, a graduation tower and a cooling well.