INVESTOR
PUPIL FOODS
LOCATION:
Odolanów
USABLE AREA OF EXTENSION:
5.03 1m2
TOTAL USABLE AREA:
10.019 m2
YEAR OF REALIZATION:
2023/2024
DESCRIPTION:
The reconstruction and expansion of the production and storage building included the addition of a storage section with accompanying infrastructure. The investment involved the construction of a single-storey, three-bay building with a steel structure, with lightweight wall cladding made of vertical sandwich panels. The roof of the building, based on a trapezoidal sheet metal structure, was covered with PIR panels. The building reaches a maximum height of 13 metres. Inside, there is a sanitary room and an electrical switchboard. Additionally, a connection was made to the existing production and storage building, which ensures functional and logistical improvement of the entire complex.