COMMERCIAL OBJECT

INVESTOR

Franc Textil Sp. zo.o.

LOCATION:

ul. Szarych Szeregów 22,
58-100 Świdnica

UTILITY AREA:

3280m2

YEAR OF REALIZATION:

2017/2018

DESCRIPTION:

Complex implementation of the DEKORIA service and commercial building with accompanying technical infrastructure and installations. The commercial and service part of the building is one-storey hall with the main supporting structure inform of…

Dombud_Dekoria_6
Dombud_Dekoria_1
Dombud_Dekoria_2
Dombud_Dekoria_3
Dombud_Dekoria_4
Dombud_Dekoria_5
Dombud_Dekoria_7

WAREHOUSE-PRODUCTION HALL

INVESTOR

„STAWIK” Andrzej Stawik

LOCATION:

ul. Staroprzygodzka 168
Ostrów Wielkopolski

UTILITY AREA:

2222,94 m2

YEAR OF IMPLEMENTATION:

2017/2018

DESCRIPTION:

Complex implementation of the single-storey production hall with steel structure (one-nave) and two-storey facilities. Main frame span 1×24,39m with axial distance a = 6m. Hall walls areencased bysandwichpanel. The roof of gable hall with inclination of 70 covered with a roofing membrane. The roof of the backrest facility is flat and covered with membrane. The backrest facilitywalls are made of ceramics, finished with elevation panels on steel frame. Access roads and yards of 2.525 m2area with the surface made of paving stones.

Dombud_Stawik_1
Dombud_Stawik_2
Dombud_Stawik_3
Dombud_Stawik_4
Dombud_Stawik_5
Dombud_Stawik_6

COFFEE ROASTING PLANT - EXTENSION

INVESTOR

Woseba Sp. z o.o.

LOCATION:

Stary Staw 9
63-400 Ostrów Wlkp.

UTILITY AREA:

1800 m2

YEAR OF REALIZATION:

2017

DESCRIPTION:

Complex implementation of the coffee roasting plant extension with the production and warehouse part in the design-and-build system. The scope of works included the construction of the hall with area of 1800 m2. Reconstruction of the existing yards, with enlargement of the parking and maneuvering area by 5200 m2. Reconstruction of fire protection network and other installations.

Dombud - Woseba
Dombud - Woseba
Dombud - Woseba
Dombud - Woseba
Dombud - Woseba

CNC MACHINE PRODUCTION PLANT

INVESTOR

STIGAL Marcin Stępień

LOCATION:

Złotniki 19
59-223 Krotoszyce

UTILITY AREA:

3334,4m2

YEAR OF IMPLEMENTATION:

2016/2017

DESCRIPTION:

The scope of works included the complex construction of production hall with area of 2350 m2, two-storey office building in traditional technology of 650m2 area. Moreover,the exit from county road, two rainwater tanks, roads and parking lots in the investment premises were constructed.

Dombud_Stigal_1
Dombud_Stigal_2
Dombud_Stigal_3
Dombud_Stigal_4
Dombud_Stigal_5
Dombud_Stigal_6
Dombud_Stigal_7
Dombud_Stigal_8
Dombud_Stigal_9
Dombud_Stigal_10
Dombud_Stigal_11
Dombud_Stigal_12
Dombud_Stigal_13
Dombud_Stigal_14
Dombud_Stigal_15
Dombud_Stigal_16
Dombud_Stigal_17
Dombud_Stigal_18

CAR COSMETICS PRODUCTION PLANT

INVESTOR

ZOFA

LOCATION:

Stary Staw 9
63-400 Ostrów Wlkp.

UTILITY AREA:

3176 m2

YEAR OF REALIZATION:

2016

DESCRIPTION:

Final executive design and realization of the modern warehouse building. The Hall made in the prefabricated, reinforced concrete structure.

Dombud - Zofa
Dombud - Zofa
Dombud - Zofa
Dombud - Zofa
Dombud - Zofa

PRODUCTION PLANT AND WAREHOUSE

INVESTOR

Franc Gardiner
Sp. z o.o.

LOCATION:

ul. Składowa 3
58-100 Świdnica

UTILITY AREA:

4 570 m2

YEAR OF REALIZATION:

2015, 2016

DESCRIPTION:

Complex realization of the production hall with warehouse in steel construction. Office building with whole necessary installations in traditional construction.

INDUSTRIAL DEVICES PRODUCTION PLANT

INVESTOR

ZUP Badura
Sp. z o.o. Sp.k

LOCATION:

ul. Kliczkowska 48
58-100 Świdnica

UTILITY AREA:

15 930 m2

YEAR OF REALIZATION:

2013, 2015

DESCRIPTION:

Complex project and realization of production object for making of industrial devices, with premises management. This object was realized in two stages. In 2013 we built the production hall with overhead cranes, of utility area 4 500 m2 and social rooms of utility area 550 m2. The main carrier construction is made of steel. Two-floor social building was brick-made.

CAR PARTS PRODUCTION PLANT

INVESTOR

Delphi Polska
Park Technologiczny
Sp. z o.o. Sp. k.

LOCATION:

ul. Spichrzowa 40
63-400 Ostrów Wlkp.

UTILITY AREA:

6 515 m2

YEAR OF REALIZATION:

2013

DESCRIPTION:

Complex project and realization of car parts production plant, together with office building, laboratory, prototype making room and premises management. The hall utility area is 3 419 m2. The building utility area is 3 096 m2.

STEEL CONSTRUCTIONS PRODUCTION PLANT

INVESTOR

Przedsiębiorstwo
Dombud Sp. z o.o.

LOCATION:

ul. Leśna 2
63-430 Odolanów

UTILITY AREA:

10 200 m2

YEAR OF REALIZATION:

2005 oraz 2015

DESCRIPTION:

Complex project and realization of steel construction production plant. Such construction was made in two stages: In 2005 we built the production hall of utility area 3 100 m2. The plant was extended in 2015 by successive 5 900 m2 of production area and 1 200 m2 office area.

METAL MACHINING PLANT

INVESTOR

Mayr Polska
Sp. z o.o.

LOCATION:

ul. Hetmańska 1
63-500 Ostrzeszów

UTILITY AREA:

18 670 m2

YEAR OF REALIZATION:

2005, 2008, 2011, 2014/2015

DESCRIPTION:

he scope of works covered complex realization of investment. The plant was several times extended over the years. In 2005 there was made two-floor office building of utility area 1 400 m2 and production hall of 4 700 m2 area. In 2008 there was added the warehouse hall of utility area 2 300 m2.

PRODUCTION PLANT OF POLYURETHANE AND WATER PAINTS

INVESTOR

PPG Deco Polska

LOCATION:

Lewkowiec 68
63-400 Ostrów Wlkp.

UTILITY AREA:

7 800 m2

YEAR OF REALIZATION:

2013

DESCRIPTION:

Complex reconstruction of the earlier existing halls built in the years 2010 and 2011, by the Enterprise “Przedsiębiorstwo Dombud Sp. z o.o.” Ltd. Co. from the warehouse into the warehouse-production object. This object was classified to the group of the higher risk objects. Realization was related with reinforcing of the existing construction,…

METAL MACHINING PLANT

INVESTOR

Balaguer
East Europa Sp. z o.o.

LOCATION:

ul. Wrocławska 93e
63-400 Ostrów Wlkp.

UTILITY AREA:

1 250 m2

YEAR OF REALIZATION:

2014

DESCRIPTION:

Complex project realization of production-warehouse hall with premises and management.

PRODUCTION PLANT OF CAR COSMETICS

INVESTOR

Inter Global  Sp. z o.o.

LOCATION:

Stary Staw 9
63-400 Ostrów Wlkp.

UTILITY AREA:

6 850 m2

YEAR OF REALIZATION:

2008, 2011, 2014/2015

DESCRIPTION:

In 2009 our company realized the warehouse hall, together with social object of 3 200 m2 area, and terrestrial fire-fighting tank. In 2011 there were added successive production buildings of 1 050 m2 area, with the underground warehouse tanks of 1 600 m3 volume. In 2015 we performed a successive production-warehouse object of 2600 m2 area, …

METAL MACHINING PLANT

INVESTOR

Cloos Polska
Sp. z o.o.

LOCATION:

ul. Stalowa 17
58-100 Świdnica

UTILITY AREA:

1 800 m2

YEAR OF REALIZATION:

2010, 2013

DESCRIPTION:

Complex realization of the production hall, with the social-office building. In 2013 the plant was extended with the lacquer painting building.

WOOD PROCESSING PLANT

INVESTOR

Sklejka ECO S.A.

LOCATION:

ul. Reymonta 35
63-400 Ostrów Wlkp.

UTILITY AREA:

3 140 m2

YEAR OF REALIZATION:

2012

DESCRIPTION:

The scope of works covered complex making of the two warehouse halls, with social rooms, wood processing hall, together with the roads and premises management.

METALS MACHINING PLANT

INVESTOR

Müller & Damas
Sp. z o.o.

LOCATION:

ul. Grabowska 83
63-500 Ostrzeszów

UTILITY AREA:

4 200 m2

YEAR OF REALIZATION:

2013/2014

DESCRIPTION:

Project and realization of the production-warehouse hall, equipped with overhead cranes and social-office building.

COFFEE ROASTING PLANT

INVESTOR

Woseba
Sp. z o.o.

LOCATION:

ul. Krotoszyńska 150
63-430 Odolanów

UTILITY AREA:

7 600 m2

YEAR OF REALIZATION:

2006

DESCRIPTION:

Complex realization of the production-warehouse hall, together with social-office building. The production-warehouse hall is of 6 000 m2 area. The social-office building has 1600 m2 area.

HALL - FITTINGS PRODUCTION PLANT

INVESTOR

Winkiel
Sp. z o.o.

LOCATION:

ul. Cisowa9
64-320 Niepruszewo

UTILITY AREA:

4 200 m2

YEAR OF REALIZATION:

2005

DESCRIPTION:

Complex realization of the modern production-warehouse object, together with roads, premises management and installations.

LOGISTIC-WAREHOUSE OBJECTS

PRODUCTION-WAREHOUSE OBJECTS

AGRICULTURAL-FOOD PROCESSING PLANTS

STEEL CONSTRUCTIONS