PRODUCTION PLANT AND WAREHOUSE

INVESTOR

Franc Gardiner
Sp. z o.o.

LOCATION:

ul. Składowa 3
58-100 Świdnica

UTILITY AREA:

4 570 m2

YEAR OF REALIZATION:

2015, 2016

DESCRIPTION:

Complex realization of the production hall with warehouse in steel construction. Office building with whole necessary installations in traditional construction.

INDUSTRIAL DEVICES PRODUCTION PLANT

INVESTOR

ZUP Badura
Sp. z o.o. Sp.k

LOCATION:

ul. Kliczkowska 48
58-100 Świdnica

UTILITY AREA:

15 930 m2

YEAR OF REALIZATION:

2013, 2015

DESCRIPTION:

Complex project and realization of production object for making of industrial devices, with premises management. This object was realized in two stages. In 2013 we built the production hall with overhead cranes, of utility area 4 500 m2 and social rooms of utility area 550 m2. The main carrier construction is made of steel. Two-floor social building was brick-made.

CAR PARTS PRODUCTION PLANT

INVESTOR

Delphi Polska
Park Technologiczny
Sp. z o.o. Sp. k.

LOCATION:

ul. Spichrzowa 40
63-400 Ostrów Wlkp.

UTILITY AREA:

6 515 m2

YEAR OF REALIZATION:

2013

DESCRIPTION:

Complex project and realization of car parts production plant, together with office building, laboratory, prototype making room and premises management. The hall utility area is 3 419 m2. The building utility area is 3 096 m2.

STEEL CONSTRUCTIONS PRODUCTION PLANT

INVESTOR

Przedsiębiorstwo
Dombud Sp. z o.o.

LOCATION:

ul. Leśna 2
63-430 Odolanów

UTILITY AREA:

10 200 m2

YEAR OF REALIZATION:

2005 oraz 2015

DESCRIPTION:

Complex project and realization of steel construction production plant. Such construction was made in two stages: In 2005 we built the production hall of utility area 3 100 m2. The plant was extended in 2015 by successive 5 900 m2 of production area and 1 200 m2 office area.

METAL MACHINING PLANT

INVESTOR

Mayr Polska
Sp. z o.o.

LOCATION:

ul. Hetmańska 1
63-500 Ostrzeszów

UTILITY AREA:

18 670 m2

YEAR OF REALIZATION:

2005, 2008, 2011, 2014/2015

DESCRIPTION:

he scope of works covered complex realization of investment. The plant was several times extended over the years. In 2005 there was made two-floor office building of utility area 1 400 m2 and production hall of 4 700 m2 area. In 2008 there was added the warehouse hall of utility area 2 300 m2.

PRODUCTION PLANT OF POLYURETHANE AND WATER PAINTS

INVESTOR

PPG Deco Polska

LOCATION:

Lewkowiec 68
63-400 Ostrów Wlkp.

UTILITY AREA:

7 800 m2

YEAR OF REALIZATION:

2013

DESCRIPTION:

Complex reconstruction of the earlier existing halls built in the years 2010 and 2011, by the Enterprise “Przedsiębiorstwo Dombud Sp. z o.o.” Ltd. Co. from the warehouse into the warehouse-production object. This object was classified to the group of the higher risk objects. Realization was related with reinforcing of the existing construction,…

METAL MACHINING PLANT

INVESTOR

Balaguer
East Europa Sp. z o.o.

LOCATION:

ul. Wrocławska 93e
63-400 Ostrów Wlkp.

UTILITY AREA:

1 250 m2

YEAR OF REALIZATION:

2014

DESCRIPTION:

Complex project realization of production-warehouse hall with premises and management.

PRODUCTION PLANT OF CAR COSMETICS

INVESTOR

Inter Global  Sp. z o.o.

LOCATION:

Stary Staw 9
63-400 Ostrów Wlkp.

UTILITY AREA:

6 850 m2

YEAR OF REALIZATION:

2008, 2011, 2014/2015

DESCRIPTION:

In 2009 our company realized the warehouse hall, together with social object of 3 200 m2 area, and terrestrial fire-fighting tank. In 2011 there were added successive production buildings of 1 050 m2 area, with the underground warehouse tanks of 1 600 m3 volume. In 2015 we performed a successive production-warehouse object of 2600 m2 area, …

METAL MACHINING PLANT

INVESTOR

Cloos Polska
Sp. z o.o.

LOCATION:

ul. Stalowa 17
58-100 Świdnica

UTILITY AREA:

1 800 m2

YEAR OF REALIZATION:

2010, 2013

DESCRIPTION:

Complex realization of the production hall, with the social-office building. In 2013 the plant was extended with the lacquer painting building.

WOOD PROCESSING PLANT

INVESTOR

Sklejka ECO S.A.

LOCATION:

ul. Reymonta 35
63-400 Ostrów Wlkp.

UTILITY AREA:

3 140 m2

YEAR OF REALIZATION:

2012

DESCRIPTION:

The scope of works covered complex making of the two warehouse halls, with social rooms, wood processing hall, together with the roads and premises management.

METALS MACHINING PLANT

INVESTOR

Müller & Damas
Sp. z o.o.

LOCATION:

ul. Grabowska 83
63-500 Ostrzeszów

UTILITY AREA:

4 200 m2

YEAR OF REALIZATION:

2013/2014

DESCRIPTION:

Project and realization of the production-warehouse hall, equipped with overhead cranes and social-office building.

COFFEE ROASTING PLANT

INVESTOR

Woseba
Sp. z o.o.

LOCATION:

ul. Krotoszyńska 150
63-430 Odolanów

UTILITY AREA:

7 600 m2

YEAR OF REALIZATION:

2006

DESCRIPTION:

Complex realization of the production-warehouse hall, together with social-office building. The production-warehouse hall is of 6 000 m2 area. The social-office building has 1600 m2 area.

HALL - FITTINGS PRODUCTION PLANT

INVESTOR

Winkiel
Sp. z o.o.

LOCATION:

ul. Cisowa9
64-320 Niepruszewo

UTILITY AREA:

4 200 m2

YEAR OF REALIZATION:

2005

DESCRIPTION:

Complex realization of the modern production-warehouse object, together with roads, premises management and installations.

LOGISTIC-WAREHOUSE OBJECTS

PRODUCTION-WAREHOUSE OBJECTS

AGRICULTURAL-FOOD PROCESSING PLANTS

STEEL CONSTRUCTIONS